Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Watiya begins by hoisting the tank and setting sturdy supports on an uneven floor surface. We run supply pipes up through the stairwell, connect overflow and ground drain, then fill to test for leaks.
Mixed old and new Watiya houses have roofs with uneven levels and walls that may be weak in spots. When setting a tank we choose a position where the floor is strongest and most stable, using concrete supports with a wide base. Pipes running up through the stairwell need vibration protection and impact guards with metal clips every metre.
Watiya is an older residential district in Kuwait City near the old city walls, where houses vary greatly in age and height.
We hand-tighten every metal joint before filling because vibration from vertical pipes quickly loosens any slack connections.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test the roof strength first by adding test weights and watching for sagging. If the floor shows weakness, we use wide timber supports to spread the load over more area, or choose a stronger position near a load-bearing wall.
We fit strong metal clips every metre along the pipe to stop sideways movement. We add rubber pads under the clips to absorb vibration and noise from fast water flow.
