Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Digging an underground tank in Watiya deals with deep sandy soil and may need wider excavation to keep walls stable while digging. We set temporary timber shoring to brace edges, then install reinforced concrete shell, apply full waterproofing and test for leaks before departure.
Family homes scattered through Watiya near the old city walls rely on simple underground tanks for night-time water collection. Sandy soil here digs easily but can slip when wet, so we brace edges with strong metal or timber planks. When pouring we use high-strength concrete and thick polyethylene waterproofing to handle seasonal moisture.
Watiya sits in Kuwait governorate near old city walls, a historical residential area of family homes with simple storage tanks.
We inspect the tank visually and by water pressure before handover because shifting sand may leave hairline cracks in concrete.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we use vertical steel sheets to brace pit walls, driving them firmly into sand every meter of depth. The sheets stay until concrete is fully cured.
At least two meters, because sand may shift under the wall if too close. We leave this gap uncompacted for at least the first year.
