Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Hawalli
On the shared roofs of Zahraa's low-rise buildings, roof tank installation means fitting one tank per household in a limited space. Each tank gets its own float valve, outlet valve and labelled down pipe, so a problem on one flat's supply never shuts off the whole building.
Several flats and a ground-floor shop in a Zahraa building often share one roof, and tanks installed at different times end up with crossed pipes, unlabelled valves and down pipes nobody can trace. When a new tank goes in we mark each tank and its valves with the flat number, run each outlet on its own down pipe to that flat, and arrange the tanks in a row with a clear walkway so every lid and float valve can be reached without stepping over pipes.
Zahraa in Hawalli governorate has low-rise buildings where several flats and a ground-floor shop share one roof for their tanks.
An unlabelled valve on a shared roof means closing the wrong one and cutting water to a neighbour.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes. We trace each down pipe from tank to flat, correct any crossed connections and label every tank and valve with its flat number.
Often, once the existing tanks are rearranged in a row. We lay them out so each keeps a clear path to its lid and float valve.
