Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Hawalli
Water tanks in Rumaithiya serve high seafront villas with very high pressure demands. We size the tank by floor count and bathroom count, then choose a pump rated for the height. Every joint is pressure-tested before residents move to their new system.
Seafront villas in Rumaithiya, especially block 2, are very tall multi-storey structures needing strong water lift from the ground floor upwards. We measure from street level to the highest draw-off point, often an upper-floor tank or penthouse bathroom. We choose a corrosion-resistant bronze pump and run a dedicated pressure line directly from it to maximum height. If the height exceeds fifteen metres we add an intermediate raised tank to ease pump load.
Rumaithiya lies in Hawalli governorate and is known for its tall luxury villas on the direct seafront.
Every pump system we install in Rumaithiya must lift water to the top floor continuously for at least three hours without drop-off.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually no, if height is great we add a simple intermediate tank without a pump that receives water from the first pump. From this tank water flows to upper floors with adequate pressure.
No, salt and strong wind demand a robust protected tank. We choose fibreglass or reinforced concrete set on deep steel foundations with hurricane-grade bracing.
