Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Hawalli
Water tank installation in Bayan serves the spacious villas around Bayan Palace and Bayan Co-op that often need two separate tanks, a rooftop tank for the main house and a smaller one for a guest annex or garden area. Technicians size capacity from the actual bathroom count, not villa footprint alone.
A large Bayan villa can hold six bathrooms or more across two floors plus a separate guest annex, and a single tank serving all of them needs a wider main pipe and a stronger pump to keep pressure equal at the furthest point. We calculate peak demand for several bathrooms running at once, determine whether one rooftop tank suffices or the annex needs its own, and fit a check valve at each main branch to stop one outlet draining the tank quickly.
Bayan's large villas in Hawalli governorate, near Bayan Palace and Bayan Co-op, often need two separate tanks for the house and annex.
A Bayan villa with six bathrooms or more needs a stronger pump and wider main pipe than a villa with only two.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on distance and usage. Sometimes a smaller separate tank for the annex is better so the main house's pressure is not affected when guests use it.
We calculate bathroom count and likely simultaneous use points, not just villa size, since a villa with many bathrooms needs more capacity than a similarly sized villa with fewer.
