Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Mubarak Al-Kabeer
Tank installation in Sabhan Industrial suits warehouses and factories needing independent supply and high-powered pumping. We select an industrial tank with large capacity, fit heavy-duty pumps and run steel pipes to handle high pressure and intense use.
Industrial facilities in Sabhan need water for cooling and production processes, so they cannot rely only on municipal supply. The industrial tank sits beside or above the building, and multiple pumps draw water from it to production lines and cooling towers. We verify pipe diameters to ensure adequate flow under required pressure with no leaks at steel fittings.
Sabhan Industrial is a warehouse and factory zone in Mubarak Al-Kabeer governorate, where large tanks and heavy pumps are essential for continuous operations.
Distribution lines from the industrial tank are tested at pressure above normal use to confirm fittings can withstand the load.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we connect them with a transfer manifold that allows water to flow from the second tank to the first if the first level drops. We test check valves and pressure to prevent backflow between tanks.
We calculate daily flow in litres, then select a copper or steel pipe diameter that maintains steady flow velocity. Oversized pipes waste cost, undersized ones cause pressure drop over long runs.
