Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Mubarak Al-Kabeer
Water tank installation in Mubarak Al-Kabeer starts with hoisting the tank to the roof and setting its height to match network pressure. We run supply and distribution lines, fit the float valve and isolation cocks and pressure-test all connections.
Most modern Mubarak Al-Kabeer homes have flat roofs and the roof tank usually sits above the kitchen near Bayan Co-op. We check concrete thickness and beam strength to ensure the tank can support a full load, then run copper pipe routes down through internal columns. If old iron pipes are causing rusty water, we replace them with new copper from the tank to every outlet.
Mubarak Al-Kabeer lies south of Kuwait City with closely-spaced multi-storey residences where low pressure is common and requires a robust roof tank.
We test a full tank by stopping the pump and waiting one hour to confirm no water level drop without drain valve opening.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the concrete is thirty centimetres or thicker with strong beams beneath, direct fixing is possible. We inspect the roof first and place load-distribution boards under the tank sides.
Fibreglass resists rust but is lighter; welded steel is stronger and cheaper but needs maintenance paint every two years. The choice depends on your budget and how long you need the tank to last.
