Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Kaifan accounts for most buildings being near the Kuwait Sporting Club and needing standardised tank sizes. We check the mains line entering the building and measure its natural pressure. We choose between roof, side-wall or underground placement based on building structure and foundation. We fit all pipes, joints and pumps, then test the system under full pressure.
Buildings around Kaifan Co-op sit on strong foundations and often have wide side yards suitable for buried tanks. We dig a pit one and a half metres deep away from existing drainage lines and set the tank inside a small concrete vault that protects it from deep moisture. Supply and waste lines run horizontally underground at steady fall, and we cap the tank with an openable metal inspection hatch.
Kaifan sits in Kuwait governorate, a residential quarter around a major sports club where land is spacious and water demand is steady.
After filling the buried tank, we drain it completely and wait six hours to check for water seepage into surrounding soil.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, because we build the pit walls from compacted clay then fifteen-centimetre reinforced concrete. We test the tank's seal by filling and draining it before final burial.
Opening the hatch and visual inspection takes thirty minutes, but full cleaning with a trained worker inside needs two hours and prior pumping. We check concrete walls, cracks and sediment buildup.