العربية Call now

Mubarak Al-Kabeer

Underground tank construction in Abu Hasaniya

An underground tank in Abu Hasaniya serves a large seaside villa needing reliable fresh-water storage. We start by locating the site clear of the house foundations and landscaping. Reinforced concrete and dual sealing keep water clean throughout the season. Final testing confirms the tank is ready for immediate use.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Abu Hasaniya villas have large gardens and swimming pools, putting pressure on the mains supply. The underground tank provides 15 to 25 cubic metres reserve depending on plot size. We locate the excavation away from existing sewers and bed the tank on clean sand. Supply pipes run under ground level and connect to rooftop storage or direct pump systems. Pipes are buried deep enough to avoid frost damage and mechanical harm.

Abu Hasaniya sits in Mubarak Al-Kabeer governorate, a luxury villa zone near the sea where soil is saline and groundwater sits high.

Tank drainage from the outlet is tested under full pump flow because weak drainage causes flooding during maintenance.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Abu Hasaniya

Common questions

Questions about Underground tank construction in Abu Hasaniya

Need someone now? The emergency line is open any hour.
+965 9668 4964

Does the high water table affect how deep we can dig here?

Yes, we excavate at least one metre above groundwater level and pump out any seepage during construction. If water is very high, we choose a smaller tank or different site location.

Does the tank need extra reinforcement because the villa is near the sea?

We use concrete with high salt and chemical resistance. Tank wall thickness is 30 centimetres instead of 25 to withstand saline conditions.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp