Copper or steel pipe run
Correct diameter pipe sized to kitchen appliance load and inlet pressure.

Mubarak Al-Kabeer
Kitchen gas installation in Abu Hasaniya serves sea-facing villas with modern kitchens and advanced ovens. We start from the main connection point near the waterfront and extend lines to each cooking appliance with precision. Multi-storey villas need steady pressure on every floor.
Abu Hasaniya villas overlook the sea and feature spacious kitchens with multiple cooking units and separate gas storage. Salt and moisture from the sea corrode pipe metals, so we choose copper tubing coated with special protective paint. Lines cross villa walls and may climb and descend between storeys, so we ensure every bend is planned and every joint sits in an easy-to-check spot.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate on the waterfront, an area of luxury villas where the marine setting poses challenges for gas line safety.
Every new line is tested with gas under high pressure for at least one hour to ensure stability in the marine environment.
Correct diameter pipe sized to kitchen appliance load and inlet pressure.
Individual outlet with isolation valve for each hob, oven or fryer.
Pipe run inside protective conduit or channel with ventilation clearance observed.
Joints finished by brazing or press-fit method suited to the pipe material.
Nitrogen pumped to test pressure and held to confirm every joint is tight.
Inspection of an existing run and repair of any corroded section or weeping joint.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose copper pipes because they resist rust, then coat them with salt-resistant epoxy paint. Every metal joint is wrapped in plastic cover to keep moisture away.
Yes, we run a vertical gas riser with sturdy diagonal tubing from the ground floor to upper storeys. Each floor gets its own pressure regulator to ensure safe, consistent flow.
