Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Adailiya requires careful site selection due to proximity to diplomatic missions and government parks. We dig at safe depth, build with high-grade concrete and sealed cement waterproofing, then test all joints and pump performance before handover.
In Adailiya near the German Embassy and Adailiya Park, modern houses have complex supply systems needing reliable tanks. We check overhead power lines and underground pipes before choosing location and stay clear of municipal boundaries. A tank with thick walls and multi-layer cement waterproofing resists high pressure and stays watertight even in extreme drought.
Adailiya is in Kuwait governorate near the German Embassy, an upscale district where building and maintenance standards exceed other residential areas.
We fill the tank completely then drain rapidly to check wall strength under sudden pressure changes before final connection.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We avoid this where possible because heavy traffic vibration causes hairline cracks in concrete over time. We choose a location in the garden if space allows to escape dynamic loading stress.
We apply minimum double-layer cement waterproofing with extra treatment for voids and hairline cracks. This ensures no leakage for at least twenty years minimum.
