Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Jaber Al-Ahmad City requires coordination with the main contractor of the new property. We choose the tank location away from footings and other pipes, then excavate, support walls and fully seal the tank. Water and air testing happens before site handover.
Jaber Al-Ahmad City is new residential development with many buildings under construction, each with an underground tank designed for its plot. Soil here is generally good, but we coordinate with other excavators to avoid cutting new pipes. We choose concrete thickness based on dig depth and expected load above the tank, and bury supply pipes safely before backfilling.
Jaber Al-Ahmad City sits in Kuwait governorate, a modern residential development where most new properties are equipped with sealed underground tanks.
We fill each tank fully for twenty-four hours before checking all pipe joints under pressure.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but only with the site engineer's approval first. We relocate the tank at safe distance from footings and recalculate excavation depth and flexible pipes based on the new position.
Right after water and air testing, but we leave the fill valve and inspection cover exposed until final network connection. We record test readings before final covering.