Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Building an underground tank in Ali Sabah Al-Salem requires special care with coastal soil and high humidity. We start with site excavation and groundwater assessment, then construct thick, sealed concrete walls. Extended waterproofing on the top slab and walls protects the tank from saline seepage and excess moisture.
Residential plots in Ali Sabah Al-Salem are near the coast, with soil high in salt and groundwater close to surface. Most homes here are new with spacious courtyards offering flexibility in tank placement. We look for a relatively high spot away from building step levels and use sulphate-resistant concrete with thick bitumen sealing on all sides.
Ali Sabah Al-Salem lies in Ahmadi governorate, where coastal soil and salt influence shorten the life of standard concrete.
Soil samples from the excavation are tested for salt content before determining the required waterproofing thickness.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, coastal soil needs double waterproofing. We use polymer-modified bitumen and liquid asphalt layer, then cover with thick plastic sheet to seal all walls, base and top slab completely.
It depends on concrete quality and sealing. With sulphate-resistant concrete, double waterproofing and regular maintenance of internal drainage, the tank stays sound for decades without leakage.
