Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Towers along Mahboula's Beach Road hold large volumes underground, and underground tank construction here is designed with cleaning in mind. We slope the tank floor toward a small sump and add fixed ladders at each hatch, so the chamber can be drained, washed and inspected properly.
In the high-rise blocks near Mahboula Co-op and Beach Road block 12, a flat bottomed tank leaves a layer of sediment that a pump cannot reach, and cleaners end up bailing it by hand. A floor laid to fall, with a sump under one hatch, lets a portable pump take out the last water and silt. We also split large tanks into two cells, so one keeps supplying the tower while the other is cleaned.
Mahboula is an Ahmadi seafront district of residential towers along Beach Road, each drawing on large ground storage tanks.
Tank floors are laid to fall toward a sump, so sediment can be pumped out rather than bailed.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Many building managers schedule it at least once a year, more often if sediment builds quickly. A sloped floor and sump make each clean faster.
With a two cell tank, yes. One cell is isolated and cleaned while the other continues to feed the transfer pumps.
