Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Hawalli
Building an underground tank in Anjafa starts by understanding local soil composition and safe distances from foundations. We select the site, excavate carefully, erect the concrete structure, then seal the tank and fully test waterproofing.
Anjafa is a residential area where medium-sized houses have reasonable gardens allowing safe tank excavation. The soil here is relatively stable but we hit gravel and lime layers needing precise digging to avoid wall cracks. We build the tank with uniform-thickness walls and apply an external asphalt seal layer followed by a concrete protection layer. The roof has openings for the access lid, cleaning port and overflow line.
Anjafa is in Hawalli governorate, a medium-density residential area where underground tanks provide reliable water backup.
We fill the tank with water and check full hydrostatic pressure for three hours before final handover.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually about six days: two for excavation and prep, three for building and sealing, one for testing and connection. Time may extend if we hit solid rock layers.
No, without the pump water won't reach upper floors under sufficient pressure. We install the pump and electrical switches when the tank is complete and test them together.