Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Mubarak Al-Kabeer
An underground tank in Funaitees provides independent fresh-water storage for families suffering supply interruptions. We start by mapping the site on soil and utilities records, then excavate and build the tank structure carefully. Multi-layer sealing and thorough testing ensure a safe, long-lasting tank. Final connection and test pumping precede handover.
Funaitees houses are medium-sized with small gardens, and most residents prefer tanks of 10 to 15 cubic metres capacity. The soil here is balanced sand and clay, allowing deeper excavation without geological issues. The tank is bedded on gravel and sand, interior sealed with cement coating and exterior protected with resin paint. Inlets and outlets connect via protected PVC pipes buried underground with sleeves at penetrations.
Funaitees lies in Mubarak Al-Kabeer governorate, a coastal residential area where central supply reliability drops periodically.
After construction, the tank is filled and the pump runs for two continuous hours to verify suction and discharge efficiency together.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The float and level switch stay inside the tank because they need only a small space. The supply pump sits outside and draws from the inlet pipe with a check valve.
We leave a 60-centimetre access opening on the tank roof with a secure cover. The opening allows passage of strainers and pipes and safe ventilation during cleaning.
