Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Gharnata starts with deep excavation below the water table to ensure complete seal against seepage. We set reinforced concrete walls and a watertight base, then test every joint by filling and pressure-testing before final connection.
Houses in outer Gharnata are older with varying depths, and many need a separate underground tank because the main sewer is distant or flows poorly. We excavate below the existing foundations and watch for groundwater during digging since it affects base strength. After pouring concrete we leave the top open for complete visual inspection before any backfill.
Gharnata lies in Kuwait governorate, a peripheral residential area where individual houses and underground tanks are a technical necessity, not an option.
Every completed tank is tested by filling completely and holding steady for eight hours to detect any slow seep.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We dig at a safe distance from foundation lines and use hand tools near old footings instead of machinery. We shore each old foundation with timber props while working.
We adjust the base design to raise the safe level above groundwater, or add drainage around the tank perimeter. Each solution keeps the tank dry and sound for years.