Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Dasman starts with deep excavation beside an older or newer villa to hold drinking and utility water. We choose a spot away from existing foundations and pipes. We pour concrete walls to calculated thickness and fully seal the floor. Then we connect supply and draw-off lines and pressure-test the entire tank.
Villas on Dasman's Arabian Gulf Street have deep foundations and relatively high ground level. The underground tank here must sit below the water table if possible, otherwise we place it between the villa and street where ground slopes less steeply. We examine the soil because it may be fine sand requiring strong lateral bracing. The draw-off line rises steeply to feed the roof tank without needing a powerful pump.
Dasman sits on the Arabian Gulf coast in Kuwait governorate, a luxury villa zone where the underground tank runs deep beneath the front garden.
The tank is filled with fresh water at least two weeks after pouring, because fresh concrete may crack under pressure.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but a safe gap of at least three metres must be left between them. This protects the well from ground settlement around the new tank and prevents one from contaminating the other.
Usually two and a half to three metres is required, depending on the villa height and groundwater level. We calculate depth so the draw-off line rises with steady fall to the roof without air locking.
