Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction in Hadiya begins with testing groundwater level and the mixed sand-clay soil. We excavate to depth, pour a strong concrete foundation, build reinforced walls with tied rebar, seal the roof with multiple layers and pressure-test with water.
Hadiya is a medium-density residential area near Ahmadi Town with detached villas and apartment buildings close to Hadiya Co-op. The soil here is mixed sand and clay, which improves excavation stability and reduces the need for trench wall bracing during construction. We measure soil compaction by sampling and test water absorption to determine the base insulation layer thickness beneath the tank.
Hadiya lies in Ahmadi governorate near Ahmadi Town, an area mixing residential and service buildings where underground tanks are essential for water storage.
Soil samples are taken from three depths to identify soil layers before tank excavation because stable clay needs less structural support.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the clay improves soil cohesion and reduces settlement. We test the clay-to-sand ratio first, then determine the concrete foundation thickness needed based on findings.
Usually not, because mixed clay naturally supports trench sides. However, if depth exceeds three metres we add timber bracing at set intervals for worker safety.