Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Kuwait City rarely means open ground. In the office buildings around Liberation Square, the new tank usually goes inside an existing basement, so every bag of cement, bar of steel and length of formwork is carried in through the car park ramp.
Buildings near the Grand Mosque and Kuwait Towers often need more storage than their original tanks provide, but the only space is a corner of the basement parking. We cast the tank on the existing slab after a structural check confirms it can carry the water load, keep dust and noise within agreed hours, and pump concrete in through the ramp so trucks never block the street during office hours.
Kuwait City is the capital's commercial centre around Liberation Square, where most buildings sit tight to their plot boundaries.
A tank built on an existing basement slab is started only after a structural check of that slab.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
That depends on the storage you need and the ceiling height available. We lay out options on the basement plan so you can see the trade off before deciding.
Noisy work like breaking and cutting is kept to agreed hours, and the work area is screened off from the rest of the car park.
