Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Sawaber means working under tall residential towers with deep, closely-spaced foundations. We dig very carefully between foundations, set reinforced concrete walls, apply complete waterproofing and pressure-test the seal before connecting water lines.
Dense residential towers in Sawaber Complex centre need strong shared tanks beneath tight courtyards and passages. Digging space is severely limited because concrete foundations sit on many close-set piles, so we use small excavators and remove soil carefully. After casting and curing we connect the tank to pumps via thick-walled metal pipes beneath the pavement.
Sawaber Complex sits in Kuwait governorate, where tall residential towers form a compact group sharing underground storage tanks.
We test the tank by filling and emptying it three times in succession because shared tanks bear high pump pressure.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We build the tank for phase one capacity but leave extra space around it for adding a second connected tank later. Multiple linked tanks offer more flexibility than enlarging one.
We base the tank on heavily compacted gravel and thick concrete instead of bare sand. We keep at least two meters gap between tank and tower foundations and check annually for settlement.
