Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction in Fahad Al-Ahmad starts with deep excavation and pumping groundwater from the pit. We build the walls in reinforced concrete at full thickness and seal the top slab with bitumen and a sand protective layer. The tank is then filled and tested before connecting supply and waste pipes.
Most Fahad Al-Ahmad homes sit on medium plots with a front courtyard, and families often need an underground freshwater tank away from the main approach. We choose a spot in the rear yard close to the main water inlet to keep the underground run short. The site is probed carefully to avoid old foundations or pipelines, then dug to the required depth based on the groundwater level.
Fahad Al-Ahmad lies in Ahmadi governorate, a family residential district where expansion is ongoing and groundwater levels vary across properties.
After excavation, groundwater is immediately pumped by electric equipment because the water table in this suburb is relatively high.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on the groundwater level and your required tank volume. We probe soil at two metres depth, then go deeper if needed so the top slab sits at least one metre below ground level.
No risk if we excavate at least three metres from the foundation. We ask for building plans and test soil around the foundation base to confirm stability before starting work.