Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Hawalli
Underground tank construction in Mubarak Al-Abdullah often happens at the same time as the villa's foundations. Building the tank then, before backfilling, lets us waterproof its outer walls properly, something that cannot be done once the soil is back in place.
Across the Mubarak Al-Abdullah residential suburb, rebuilt villas open up the whole plot for a short period. We use that window to cast the tank base and walls in one sequence with the footings, apply a bitumen membrane and protection board to the outside, and fill it with water for the leak check while the walls are still exposed. Only when the level holds do we hand the area back for backfill.
Mubarak Al-Abdullah is a Hawalli residential suburb where villa rebuilds often clear the whole plot down to foundation level.
External waterproofing is applied and the tank water tested while its outer walls are still exposed.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Access becomes tight, the outer walls cannot be waterproofed as well, and digging next to new foundations adds risk. Building it with the structure avoids all three.
Yes. We agree the tank position and levels with the contractor's engineer and fit our work into their programme.