Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
Building an underground tank in Ruqai requires quick site assessment and groundwater level checking to prevent corrosion. We start with precise digging and build block walls fully sealed against moisture seeping from outside. Joints and the floor are tested under real water pressure. We then connect inlet and outlet pipes and complete handover.
Ruqai residential homes are medium-sized and rely on water collection tanks under narrow yards sometimes. The soil here is dense clay, which eases digging but raises the risk of water pooling around the tank after rain. We add surrounding drainage pipes and raise the tank level slightly to ensure proper outward fall. The location near Ruqai Co-op provides good access for heavy equipment.
Ruqai is in Farwaniya governorate, a residential area where every house needs a water collection tank protected from groundwater seepage.
Every metal and cement joint is tested visually and with pressured water before the tank is buried under the floor.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Clay soil provides good support for the tank and prevents shifting. But high moisture around the tank can rust reinforcing steel if outer sealing is weak. We use thick cement coating and drainage pipes to prevent these problems.
If built solidly and sealed well from the start, the tank lasts for decades without repair. We advise draining sediment every two years and checking the walls from inside every five years for any cracks.
