العربية Call now

Farwaniya

Underground tank construction in Farwaniya

Farwaniya plots sit wall to wall, and underground tank construction here means digging right beside a neighbour's foundations. We shore the excavation, keep a safe margin from the party wall and work in short sections, so the buildings on either side stay undisturbed.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Around Farwaniya Co-op and the blocks off the Third Ring Road, apartment buildings share boundary walls and there is no spare land beside them. An open excavation next to a shallow footing can let soil slip from under it. We install timber or steel shoring as we dig, keep machinery back from the edge, and backfill in compacted layers once the tank is complete. Tanks for larger buildings are cast in stages, so no long trench stays open beside the party wall.

Farwaniya is a dense governorate centre around Farwaniya Hospital and the Third Ring Road, with apartment blocks built wall to wall.

Excavation beside a shared boundary wall is shored as it deepens, never left as an open unsupported face.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Farwaniya

Common questions

Questions about Underground tank construction in Farwaniya

Need someone now? The emergency line is open any hour.
+965 9668 4964

Should we tell our neighbours in Farwaniya before the excavation starts?

Yes, it is good practice. We can explain the shoring and the working hours to them so they know what to expect next to their wall.

Can the building stay occupied while the tank is built?

Yes. The work area is fenced off, access to the entrance is kept open, and water is supplied from the old tank or a temporary one.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp