Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Jahra
Building an underground tank in Saad Al-Abdullah City starts with studying groundwater levels and soil bearing capacity. We excavate to depth, construct the tank in reinforced concrete with a strong waterproof seal, install inlet, outlet and ventilation pipes, then test under pressure before backfilling.
The houses in Saad Al-Abdullah City are modern and laid out in a regular grid, so the distance from the front gate to the underground tank spot is often very short. We protect the supply and waste lines from damage during excavation and backfill around the tank. The ground here is level and dry most of the year, making the dig straightforward and seasonal drainage around the tank poses no major risk.
Saad Al-Abdullah City lies in Jahra governorate, a planned residential suburb where spacing between homes is tight and underground utilities are dense.
Every tank is tested full for 24 hours to check the walls and joints for any leak.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use high-strength concrete mix and reinforce walls and floor with cross-laid steel mesh. After pouring, the concrete cures for seven full days before any load is applied.
Yes, but a strainer must be fitted to the inlet to trap sand and leaves from roof runoff. We add an overflow pipe to shed excess water during heavy rainfall.