Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Hawalli
Water tank installation in Zahraa supplies mid-rise blocks of three to six floors through one rooftop tank feeding a shared vertical stack. Choosing the right pump so pressure reaches the top floor without overwhelming the lower ones is the central task in this Hawalli district.
A five-floor Zahraa block relies on one rooftop tank distributing water through a shared vertical stack, and if the pump is weaker than needed, the fifth floor gets weak pressure while the ground floor suffers excess pressure straining its fittings. We calculate the height difference between tank and furthest outlet, choose a balanced booster pump, and fit pressure-reducing valves at lower floors where needed to protect internal fittings from strain over time.
Zahraa in Hawalli governorate is a district of mid-rise blocks, three to six floors, relying on shared rooftop tanks.
The ground floor of a mid-rise Zahraa block typically receives higher pressure than the top floor on the same tank system.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Gravity and height reduce pressure the further a floor sits below the tank, so we tune the pump and sometimes add reducing valves at lower floors.
Not always. Often one correctly sized pump is enough to serve every floor if capacity and pressure are calculated accurately from the start.