Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Capital
A central heater in Adailiya starts with location assessment, house size and distance from unit to farthest outlet. We choose a safe position for the unit away from living areas, then run insulated distribution lines. We fit a circulation pump and finish with full flow, pressure and temperature checks.
Houses in Adailiya near Adailiya Co-op and Adailiya Park often have high ceilings and side annexes. The heater can sit in a utility annexe or small kitchen because distance to front and rear bathrooms is roughly equal. We check existing pipework first because old pipes may leak under the raised pressure from the heater. We run new copper lines through insulated ceilings with flexible joints at connection points.
Adailiya sits in Kuwait governorate near the German Embassy and Adailiya Park, an upscale residential zone with well-balanced house layouts.
We check cold-water pressure from the rooftop tank before installation because the heater raises pressure and needs a safety valve.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The heater itself does not reduce cold-water pressure, but it raises total system pressure. We fit a safety valve and air vent to prevent overpressure.
Usually one or two seconds if the pump runs at sufficient power. We test this at every tap after installation to ensure you are satisfied with heat delivery speed.
