Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Capital
Central heater installation in Jaber Al-Ahmad City benefits from modern villa designs where pipe runs are pre-planned. We coordinate boiler placement with the contractor, then lay copper pipes through walls already insulated. Testing and commissioning happen before house handover.
New Jaber Al-Ahmad City villas follow a standard layout with closely grouped bathrooms and clear living zones. This lets us place the boiler near the main bathroom cluster without major structural changes. Pipes run inside walls before plastering, and we ensure boiler-to-furthest-bathroom distance stays reasonable to avoid heat loss. The expansion tank and circulation pump go to the first floor or roof depending on design.
Jaber Al-Ahmad City is a new residential development in Kuwait governorate with thousands of villas built to uniform modern standards.
The circulation pump is calibrated before handover to move hot water continuously throughout the day without unnecessary noise.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, in new houses like Jaber Al-Ahmad City, copper pipes run inside walls before plastering, which is cleaner and better for heat retention. We leave marked openings on each floor for bathroom connections.
We coordinate with the builder to start before plastering and finishes, weeks ahead of schedule. With proper planning it causes no delay because we work in parallel with other trades.
