Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Farwaniya
Central heater installation in Khitan Al-Jadida begins by locating the unit on the roof or in the kitchen cupboard, then running distribution pipes to every bathroom. We pressure-test, check flow balance and confirm even heat delivery across all outlets before handover.
Khitan Al-Jadida houses often have three storeys with more than three bathrooms, and the distance from roof to the second-floor bathroom can reach six metres. We run copper pipes within wall chases or externally if the layout allows, and fit isolating valves and air vents at the highest point. Pressure testing takes at least an hour to detect any joint leaks before the heater fires up.
Khitan Al-Jadida lies in Farwaniya governorate, a modern residential district where families increasingly need a unified hot water system serving every floor.
The complete loop runs cold first to reveal leaks at joints, because heat can mask slow seepage.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we ensure the discharge outlet drains water away from the southern roof edge. We mount the unit on a level concrete pad and brace the inlet and outlet pipes with a secured metal bracket.
Height reduces natural pressure, but we adjust the main distribution valve at the unit and confirm pipe diameter does not reduce going up. If flow remains weak we fit a circulation pump.
