Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Hawalli
Central heater installation in Ministries Area serves large administrative buildings needing reliable hot water across multiple floors. We size the unit by bathroom count and storey height, run hot distribution pipes through corridors and ceilings, and pressure-test and temperature-check before handover.
Government ministry towers near the Civil Service Commission building typically stand several storeys high with long corridors, meaning hot water pipes must travel far from the plant room to the bathrooms. We size the pipe diameter and check insulation to reduce heat loss in those long runs, and fit isolation valves at each floor for safe maintenance. This also calls for a return circulation valve to push hot water quickly to the furthest bathroom.
Ministries Area sits in Hawalli governorate near the main Government Complex, where large administrative buildings cluster in a confined footprint.
We inspect every welded joint in the hot distribution network because sustained pressure in multi-storey towers quickly reveals small leaks.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a return circulation valve that constantly sends cold water from the furthest point back to the heater, so users do not waste water waiting for hot flow. This loop is tested under full load before handover.
We wrap the pipes with 20mm foam polymer to cut heat loss over long corridor and ceiling runs. The insulation also protects staff from burns if they accidentally touch the pipe during maintenance.
