Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Hawalli
Central heater installation in Zahraa fits mid-rise apartment blocks of three to six floors with a shared plant feeding a common riser. Technicians in this Hawalli district design the riser and branch layout so every floor receives balanced hot water pressure from a single installed system.
Installing a shared plant for a Zahraa apartment block means routing one riser up through the stairwell to feed branches on every floor, and getting the pipe sizing wrong at the base means upper floors run weak while the ground floor runs strong. We calculate pipe diameter against the full floor count, install balancing valves at each branch, and test pressure at the top floor before considering the job finished.
Zahraa in Hawalli governorate is a mixed area of small to mid-size apartment blocks around the Zahraa Co-op, mostly three to six floors.
Incorrect riser pipe sizing at the base of a Zahraa apartment block leaves the top floor with noticeably weaker hot water pressure.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
With correctly sized risers and balancing valves at each branch, yes. We test pressure at the top floor specifically before finishing the installation.
Most of the work happens in the stairwell and utility spaces. Individual flats are usually only involved briefly to connect the final branch.
