Site and capacity check
Capacity matched to actual household size and usage pattern

Mubarak Al-Kabeer
A new heater fitted right from day one in Sabhan Industrial starts with reading main line pressure at the factory intake. We size the heater to daily demand, run insulated pipework and test under full load before operation.
In the industrial zone, factories and warehouses run high water demand at washstations and basins. The heater sits near peak consumption points to cut heat loss over long pipe runs. We test actual output to ensure required temperature reaches distant stations even during simultaneous use.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, where factories and warehouses cluster near the new Gulf Road.
Because factory demand swings through the day, we test the heater during peak usage hours before handover.
Capacity matched to actual household size and usage pattern
Secure fixing to wall or platform rated for the tank weight
Hot and cold lines connected with heat-rated fittings and isolation valves
Electrical or gas supply connected; ventilation verified for gas units
Pressure relief valve and expansion vessel fitted before pressurising
System filled and checked for leaks before final handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If stations cluster close together, one large central heater with a thermostatic valve controls temperature. If stations spread across the warehouse, we may fit a small heater near each cluster.
We measure it first with a handheld gauge. Below 1 bar, we recommend a boost pump before the heater. Above 8 bar, we fit a pressure reducer.
