Walls and base coating
Full internal surface treated including the pit base

Farwaniya
Cesspit waterproofing in Rehab starts by inspecting the walls and floor for cracks that let sewage seep into the ground. We apply chemical sealant layers and run a camera test before the cover closes. The area has older family homes and damp soil in winter.
Most Rehab houses have a pit beneath the ground yard, one and a half to two metres deep. Walls are usually block and the base is concrete; after years seepage appears along the upper walls inside or in the soil outside. We remove the cover and use suction to pinpoint the leak before applying polyurea sealant.
Rehab is in Farwaniya governorate, an established residential zone with mixed urban development and multi-storey family houses.
We test every pit by pumping measured water and checking the surrounding ground for seepage under pressure.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
After applying the sealant we fill the pit with fresh water and watch the level for a full hour. If the level stays steady, the seal is sound and ready for use.
The pit must be drained completely first because water stops the sealant bonding to the walls. We pump out the water, then scrub the walls with high-pressure water before application begins.
