Frame condition check
Existing frame inspected before any fitting to confirm it can hold the new cover

Farwaniya
Manhole cover installation in Khitan Al-Jadida starts by inspecting the frame below ground and clearing mud and silt from its top. We select cover grade based on the traffic load expected on the residential street. We level the frame using sand screed and seat the cover so it does not rock or rattle underfoot. We test the seal by running a brush around the cover edges to confirm no water escapes from below.
Khitan Al-Jadida has a drainage network running under wide residential streets, with each manhole serving a section of the main pipeline. The ground here is sandy above an impervious layer, so if the cover is not seated properly it will sink over time or surface water will leak in during rain. We remove the old cover and check the frame's metal thread, then clean under the frame with water and brush and lay fine sand at a uniform height. The new cover must match the frame diameter and sit evenly on all four edges with equal weight.
Khitan Al-Jadida lies in Farwaniya governorate, a modern residential suburb where the natural ground level sits below the finished street level.
We transport the cover and frame together to site by equipped vehicle because the iron cover weighs over one hundred kilos.
Existing frame inspected before any fitting to confirm it can hold the new cover
Load rating matched to location: pedestrian walkway or vehicle driveway
Broken frame lifted cleanly without disturbing the chamber walls below
Frame set on a firm, even bed to prevent rocking or sinking under load
Cover surface aligned flush with surrounding tile or asphalt to eliminate a trip edge
Cover pressed and lifted to confirm no rocking, play or misalignment before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We raise the frame using an additional metal ring of the same outer diameter, then level the surface with sand and cement before seating the cover. Proper levelling prevents water pooling around the cover.
It must match in diameter, thickness and iron grade to withstand the expected load. We choose the grade based on whether the manhole sits under a main street or a narrow lane.
