Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Mubarak Al-Kabeer
The sewer network in Abu Hasaniya serves large seaside villas needing precise wastewater and stormwater drainage. We run pipes from each villa through the back garden to the main collection line. We test every joint and then connect it to the municipal network at the approved point.
Villas in Abu Hasaniya sit on large plots with wide spacing between homes, meaning waste lines need long underground runs across gardens and courtyards. We dig a steadily falling trench from the villa to the collection point, laying PVC or cast-iron pipe based on burial depth. As the waste line approaches the sea, we raise it to avoid reaching the saline layer.
Abu Hasaniya lies in Mubarak Al-Kabeer governorate on the coast, where luxury villas stretch between the beach and the highway.
We measure soil salinity at different depths before setting final pipe burial depth for waste lines.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, salt environment corrodes metals quickly. We use flexible PVC or cement-coated cast iron pipe, raising it above the saline soil layer. Regular inspection points allow us to check sections without excavation.
Full installation from villa to collection point usually takes three to four working days, depending on line length and ground type. Pressure testing and municipal inspection add another day.
