Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Ahmadi
Sewer network installation in Shuaiba Industrial starts by surveying the factory or warehouse layout and mapping existing pipe runs. We establish the main collection level and extend waste lines from each discharge point with steady fall toward the inspection chamber. Each section is pressure-tested and the municipal connection is documented before backfilling.
Large factories and warehouses in Shuaiba need more than one inspection chamber because long waste lines require access points for routine cleaning and maintenance. We calculate the number of chambers based on line length, bends and expected flow volume from facilities and industrial processes. Sand and sediment from operations may settle in pipes, so we specify larger bore and install a pre-filter before the municipal connection.
Shuaiba Industrial sits in Ahmadi governorate and houses the KIPIC petrochemical complex and hundreds of heavy factories and warehouses.
Every waste line is tested by filling from above and inspecting inside the pipe to confirm joints are watertight.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place a chamber at each direction change and every 50 metres on straight runs. Depth and size depend on expected flow volume from building facilities and internal processes.
Yes, if processes discharge acidic or oily liquids we use resistant PVC pipes and chambers with protective linings. We obtain discharge data from the facility manager and select materials accordingly.