Blocked outlet clearing
Removing sand and silt blocking storm-water outlet pipes

Ahmadi
Storm-water drainage in Shuaiba Industrial requires careful grading around heavy plant and storage tanks. We design collection lines that prevent pooling beside foundations and direct runoff to sump wells. We check the fall on every section and test discharge by simulating rainfall.
Shuaiba Industrial sites are mostly concrete and asphalt, so water does not seep into ground but flows rapidly across the surface. We locate the low spots where runoff pools after rain and lay collection pipes in large diameters from these points toward sump wells. We check pipe fall with a water level to ensure steady flow without stagnation.
Shuaiba Industrial lies in Ahmadi governorate where petrochemical plants and large storage facilities require reliable storm-water drainage.
We test every collection line by pumping water at pressure from the highest point to check for sand or silt blockage before service.
Removing sand and silt blocking storm-water outlet pipes
Water jet cuts through compacted sand and dried silt inside the line
Internal filming before and after so the clear result is confirmed
New network laid to correct falls for the property footprint
Emptying and cleaning collection sumps and linked floor gullies
Pre-season visits to keep storm lines clear before rain arrives
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure floor levels and locate the low spots, then lay covered collection pipes from those points to the sump well. We raise the gradient gradually with a thin concrete layer if needed.
Yes, silt and sand accumulate in horizontal pipes after each rainy season. We flush every line twice yearly with high-pressure water to clear deposits.
