Site level survey
Ground elevation readings confirm the natural direction water will travel

Farwaniya
Roofs of apartment blocks near Farwaniya Hospital are crowded with water tanks, AC units and satellite dishes, and storm-drain network design in Farwaniya has to fit outlets and falls around them. We map every piece of equipment before placing a single outlet.
Equipment bases act like small dams on a flat roof, trapping water behind them and sending it toward the wrong corner. On blocks along the Third Ring Road, we survey each roof, record tank stands, AC plinths and cable trays, then divide the roof into catchments that each reach an outlet without crossing an obstruction. Where a base blocks the natural fall, the design adds a small channel or a secondary outlet. Condensate lines from AC units are routed to drains rather than left to run across the roof.
Farwaniya, around Farwaniya Hospital, Farwaniya Co-op and the Third Ring Road, has apartment blocks with equipment-crowded flat roofs.
Every tank stand, AC plinth and cable tray is surveyed before roof catchments and outlets are drawn.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes. A channel or extra outlet beside the equipment lets trapped water reach the drain.
It should be piped to a drain point, not left to run across the roof and stain the surface.
