Pipe routing
Mapping every copper run before walls are plastered over

Capital
Central gas installation in Abdullah Al-Salem starts by reading the distribution drawing from the meter to each planned outlet. We run copper pipes through walls before plastering, pressure-test every branch and check for leaks before the walls close.
Most houses in Abdullah Al-Salem are newly built family villas with large kitchens, built-in gas ovens and central heating systems. Pipe routes run long from the meter in the front utility cupboard to the kitchen, living areas and bathrooms. We air-pressure test every branch before connecting any appliances to avoid air pockets in the pipes during use.
Abdullah Al-Salem sits near the British Embassy and the central park, a quiet residential zone of low-rise family villas.
Every pipe is sealed with a calibrated plug before walls close to keep plaster dust and debris out of the lines.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on the incoming pipe size from the street and the required pressure. We read the main station specifications, calculate the total demand from all ovens, heaters and water heaters running together, then size the internal pipes accordingly.
We pressure-test with compressed air at least one hour before walls close, and if the gauge holds steady there are no leaks. After plastering and connecting appliances we test again with actual gas using soapy water on every joint.
