Pipe routing
Mapping every copper run before walls are plastered over

Mubarak Al-Kabeer
Central gas at Abu Hasaniya serves spacious seafront villas with multiple branches to large kitchens, ovens and heating systems. Copper lines run from the street meter through walls before any paint goes on. We pressure-test and leak-check everything before walls are closed.
Abu Hasaniya villas face the sea with spacious interiors and raised floors. Gas networks need separate branches for each floor, main living rooms and separate staff quarters. Long distances and many joints mean testing must be meticulous. We coordinate with building phases so no other team cuts our pipes after we leave.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate, a seaside villa district with large gardens and waterfront views.
Each branch is tested separately before final system testing because Abu Hasaniya villas demand precision in internal joints.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, a separate meter is installed for staff quarters and tested independently. This allows one side to be shut or serviced without affecting the other.
In Abu Hasaniya villas, most pipe runs are inside walls before painting. External pipes are installed later if needed, always in protected metal ducts.