Pipe routing
Mapping every copper run before walls are plastered over

Ahmadi
Central gas network installation in Bnaidar begins with a precise site survey mapping the meter position and planned outlets. We run copper pipes with a steady fall, testing pressure and leaks at every joint before walls close.
Bnaidar homes range from villas to apartment blocks built on deep footings. Pipes run through pre-formed ducts in footings or inside reinforced concrete walls away from moisture sources. We pitch each branch evenly from the meter and fit isolation valves at each unit entry for independent shutoff.
Bnaidar sits in Ahmadi governorate, a mixed residential district combining detached villas and residential blocks.
After full installation, each welded joint is helium-tested to detect any leaks invisible to the naked eye.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We flush the network with high-pressure nitrogen first to clear any metal debris or moisture. Then we run gas slowly through a separate test point before connecting any final appliances.
Yes, but it requires cutting into existing pipes, fitting a welded tee, and re-testing the entire network pressure. We prefer precise planning before decoration to avoid that disruption.
