Pipe routing
Mapping every copper run before walls are plastered over

Ahmadi
Central gas network in Wafra feeds farmer homes, cooperative shops and agricultural stores. We run copper lines from the main inlet meter to every house and facility, testing each branch with air pressure before plastering walls.
Wafra farm homes have large kitchens, high storerooms and attached sheds, and pipes must reach all these points from a single inlet. We run the main line from the meter room through the central corridor and branch into separate runs for each area, with a main isolator at the start and branch isolators at kitchen, store and shed. Pipes are routed to fall steadily toward a moisture collection point at the network low point. Before finishing we run all outlets together and check pressure and flow for leaks.
Wafra sits in Ahmadi governorate near the Saudi border, a traditional agricultural zone specializing in irrigation and livestock.
Each Wafra network branch is tested separately for three minutes because long pipe runs require checking the fall gradient at each section.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We route pipes with steady fall toward a low collection point at the network end, where we fit a manual drain tap for the farmer to open monthly and flush accumulated water. The fall must not drop below one millimeter per meter of pipe.
Yes, but expansion requires checking pressure in the existing branch first to confirm capacity for extra load. We connect the new branch via an isolator on the main line and test the complete network together.