Pipe routing
Mapping every copper run before walls are plastered over

Jahra
Central gas network installation in Jahra New runs pipe from the individual or shared meter to the cooker and heater in each unit. We test all joints at steady pressure and confirm no gas escapes before walls are sealed and final sign-off.
Jahra New projects are built as repeated identical units packed closely, and the gas meter usually sits on an external wall near the entrance. We run the main pipe from the meter to the kitchen protected in conduit, then branch gas to cooker and heater in separate lines. Identical unit design means we follow approved templates for each branch, but we test each unit separately because humidity and heat effects vary from location to location.
Jahra New sits in Jahra governorate near Jahra Mall, Jahra Hospital and the New Jahra Co-op.
We flush gas lines with clean water to remove any factory dust before starting pressure testing.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The basic route from meter to kitchen is the same, but testing and documentation are done separately for each unit. Small variations may exist in the actual meter location or connection quality from construction.
Because site application may differ from design due to building movement, humidity and manual fitting. Every unit must pass a separate pressure test before acceptance.