Pipe routing
Mapping every copper run before walls are plastered over

Jahra
Gas network built right before the walls close in Qasr begins at the main gas meter in the external yard. We run copper lines to each flat, kitchen and heater and pressure-test the entire network before gypsum board goes up.
Qasr residential buildings are typically seven or eight storeys with multiple flats per floor. Each floor needs an intermediate distribution point from which a vertical gas riser runs in a dedicated chase before fanning horizontally to each flat. We measure runs precisely because long pipes need metal brackets at midspan, and any sag increases flow resistance. After fixing each branch, the network is filled with nitrogen and gently blown through for ten minutes to catch any tiny puncture.
Qasr is a residential neighbourhood in Jahra governorate, marked by high-rise buildings and dense occupancy.
Test pressure readings are recorded on an approved form before finishing because inspectors require this documentation at final inspection.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Nitrogen is non-flammable, so we can blow hard without explosion or fire risk. Natural gas requires slower, more cautious testing.
Yes, because copper pipe weight causes sag that flattens the gradient and traps any condensed water inside. Brackets keep the pipe at a steady fall from meter to each outlet.
