Pipe routing
Mapping every copper run before walls are plastered over

Capital
The first-fix gas network in Sawaber extends from the central service room to every unit and outlet before concrete sealing. We install code-compliant pipe and pressure-test every section. Technical documents and test certificates are signed before final handover. The work requires coordination with all other trades.
High residential towers in Al Sawaber Complex contain dozens of units per building and each needs its own gas network for kitchen and heating. Main pipe runs through concrete foundations and central ducts through the towers. We calculate the pressure needed at the highest floor then choose the main pipe diameter to deliver it. Each branch to an apartment is tested individually after connection. Sealing and documentation happen after all tests pass and pressure is measured on every floor.
Sawaber in Kuwait governorate is a modern residential complex of high towers where centralised gas distribution starts from a single point.
In Sawaber we test every three floors separately because the number of units is large and pressure varies significantly between lower and upper floors.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test every three floors sequentially to narrow down the location. Then we coat the pipes with soapy water to find bubbles indicating the leak. If it is at a joint we undo and remake it; if it is in the pipe we replace it.
No, each apartment needs its own meter for billing, metering and safety. We install multiple meters in one service room with main branches distributed from there.
