Copper or steel pipe run
Correct diameter pipe sized to kitchen appliance load and inlet pressure.

Capital
A kitchen gas line in Bnaid Al-Qar runs from the coastal meter box to each cooker and oven with marine moisture protection. We test pipes with a special saline solution. Joints are coated with an extra protective layer. Pressure is checked a week after installation.
Bnaid Al-Qar villas on the waterfront near old airport road face high humidity and salt air. The gas line here needs copper-coated or galvanised steel pipes to resist corrosion. We test each joint using ultrasonic inspection to confirm the protective layer stays sound. Pipes are fixed with metal angles that do not touch outer walls directly to reduce condensation. Follow-up checks happen every six months because of harsh coastal conditions.
Bnaid Al-Qar sits in Kuwait governorate on the beachfront near old airport road, where salty climate demands special gas line protection.
We test pipes with an electronic moisture probe after installation because sea salt speeds corrosion of uncoated metals.
Correct diameter pipe sized to kitchen appliance load and inlet pressure.
Individual outlet with isolation valve for each hob, oven or fryer.
Pipe run inside protective conduit or channel with ventilation clearance observed.
Joints finished by brazing or press-fit method suited to the pipe material.
Nitrogen pumped to test pressure and held to confirm every joint is tight.
Inspection of an existing run and repair of any corroded section or weeping joint.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we use galvanised steel or copper-coated pipes with a thick protective layer. Every joint is sealed with salt-resistant paste and we apply extra coating over it.
We recommend a quick check after one month then every six months after to inspect the protective coat. If any discolouration or rust appears we replace that section immediately.
