Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Farwaniya
Restaurant gas network installation in Ardhiya Industrial starts by checking the cylinder position and distance to the stove and oven. We run copper pipes from the regulator through kitchen walls and test every joint with soapy water. Handover includes full pressure test and leak verification at all connections.
Restaurants in Ardhiya Industrial are often in converted warehouses with high ceilings and brick walls. Gas networks need robust wall mounting, and large kitchens here typically have dual-burner stoves, ovens and grills. We run pipes at a consistent height to avoid water pooling in dips, using steel clips every metre to support weight during vibration.
Ardhiya Industrial lies in Farwaniya governorate, a zone of warehouses and factories run by food traders and catering contractors along main distribution routes.
The full network is pressure-tested at 4 bar for two minutes to ensure pressure does not drop when more than one burner runs at once.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on cylinder size and regulator capacity, but an average kitchen with a dual-burner stove and one oven needs a 30 kg cylinder every two weeks. We choose cylinder and regulator size based on the menu and operating hours, then verify pressure stays stable under peak load.
Yes, the cylinder or main line should be closed daily to reduce leak risk while shut. We install an easy-turn main stopcock beside the regulator and train staff on safe closure procedure.
