Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Ahmadi
Restaurant gas network installation in Mangaf starts by checking the external cylinder position and distance to the kitchen entrance. We run copper pipes with gentle slope to drain any moisture, then connect each appliance to a separate outlet from the branch manifold. Testing isolates each branch separately then runs the full network together.
Mangaf restaurants are often in small shopping malls or standalone shops with tight kitchens and rear entrances. The cylinder and regulator sit outside on a metal stand shielded from sun and rain, and pipes run along the exterior wall using steel brackets every metre. We re-check bolts after one week because thermal expansion loosens them.
Mangaf sits in Ahmadi governorate near Abu Halifa, a coastal desert zone with small restaurants and hotels.
Outdoor pipes in Mangaf expand by 3 mm per metre in summer, so we use compensating expansion loops instead of straight runs.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper pipes wrapped in reflective yellow plastic covers and paint the brackets with rust inhibitor every two years. The cylinder and regulator sit in a ventilated metal box to keep salt and humidity from reaching the joints.
Yes, pipes and brackets should be checked every three months for cracks or cover wear. We pressure-test every six months to detect small pinholes invisible to the eye.
