Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Ahmadi
Installing a gas network in Zour restaurants near the power plant requires pipes running through high-temperature zones and strong mechanical forces. We use welded steel tubing, heat-resistant brackets and test both pressure and thermal isolation before handover.
Restaurant buildings in Zour sit near steam pipes and mechanical systems of the plant, which means the gas line cannot pass close to direct heat sources. We route pipe along a longer path away from any steam or thermal collector, with metal brackets at short intervals to reduce vibration from pumps and motors. We wrap pipe with thermal insulation at any point exceeding 40 degrees Celsius, and test under full pressure twice before handover.
Zour in Ahmadi governorate holds a major power generation plant and its associated industrial facilities, with canteens serving the workforce.
Because the plant generates continuous vibration, we check every metal bracket to ensure it does not loosen or shift before use.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We maintain at least 50 centimetres clear of any steam pipe, routing the gas line above or below with an air gap. Where distance is shorter we wrap the pipe with thick silicate insulation and verify it with a temperature gauge.
Yes, continuous vibration loosens joints over time, so we install sturdy metal brackets every 1.5 metres and finish each joint with a tight pressure coupling. We test the network under full pressure again one day after installation to confirm stability.
